36″ ELP II Pipeline by Horizontal Directional Drilling (HDD) Arepo – Ibafo
16″ x 1.8km Sectional Replacement Using HDD From AbuleAdo to Ijeododo
Chevron EESP HDD Arouton Creek Crossing
River Niger Project 2020
Dangote Project 2019
Construction, Laying, and Commissioning of 15km of 12″, 8″, & 4″ Underground Steel Pipeline Laying Work & Above Ground Piping Work at Ibafo Area (Lagos – Ibadan Expressway) – Phase 2
HDD For Escravos River Crossing
Construction, Laying, and Commissioning of 15km of 12″, 8″, & 4″ Underground Steel Pipeline Laying Work & Above Ground Piping Work at Ibafo Area (Lagos – Ibadan Expressway) – Phase 1
Construction, Laying, and Commissioning of 50km by 4″, 8″, & 12″ Gas Distribution Pipeline in Benin City and 3 No CNG Filling Stations
Pipeline Construction of 50km Gas Distribution Line
Yenogoa 40″ Dia Road/River/Pond Crossings by HDD
Pipe lay and Weld for the Construction of Transmission Pipeline from Ukanafun in Akwa Ibom State to Mfamosing in Cross River State
Construction, Laying, and Commissioning of 24inch X 21.5km Gas Transmission Pipeline at Adanga to Calabar
Expansion of Escravos-Lagos Gas Pipeline Project – Phase II
Excravos Lagos Gas Pipeline Project, Phase 2
Ango to Auntie Julie Pipeline works for the provision of hydrocarbon evacuation pipeline from the Ango reservoir in OML-59 to Auntie Julie production facility
Emergency Reconstruction of Atlas Cove – Mosimi 16″ X 3000 pipeline section at Arepo swamp using Horizontal Directional Drilling (HDD)