Project Highlight

Yenogoa 40″ Dia Road/River/Pond Crossings by HDD

Scope of Project

  • Install 40″ x 760m pipeline at a depth of 100 feet using HDD
PROECT NAME:

Construction and Installation of 40″ x 760m Gas Pipeline by Horizontal Directional Drilling (HDD) under the Mbiama to Yenogoa dual carriageway in Yenagoa for the Eastern Gas Gathering System Phase II Pipelines (EGGS-2)

CLIENT:

Daewoo Nigeria Limited / SPDC

SUBCONTRACTOR:

Enikkom Construction Limited

PROJECT STATUS:

Completed, February 2010.