Project Highlight

Engineering, Procurement, Construction and Installation of 36inch (schedule 22.225) x 1.5km Gas Pipeline across Swamp and River using Horizontal Directional Drilling (HDD) method at Ejinrin, Epe, Lagos Stat. EPC Contractor.

Scope of Project

  • Procurement, feasibility study, design, welding, pre-testing, drilling of the 1.5km long x 26″
  • Crossing using 2 nos. Maxi rigs (300Tons and 500Tons)
  • HDD intersect method was also used here whereby the 2 rigs drilled from both ends, intersecting at the middle of the pilot hole.
  • Tile-in, commissioning
  • Catholic Protection (CP) Installation.
PROECT NAME:

Lekki Gas Pipeline Project (LGPP)

CLIENT:

Dangote Refinery Limited

CONTRACTOR:

Zakhem Construction Nigeria Limited

PROJECT STATUS:

Completed, June 2019.