Project Highlight
SPDC Otumara-Escravos Pipeline Project – Installation of (12″ + 3″) x 2.78km bundled crossing.
Scope of Project
- Mobilization of 2nos. HDD rigs (300tons) plus (500 tons) to site.
- Site set up
- Installation of 12″ + 3″ x 2.78km long bundled crossing using intersect method whereby the crossing was drilled from both ends using 2 (rigs) and intersecting at the middle for the pilot hole.
PROECT NAME:
SPDC Otumara-Escravos Pipeline Project
CLIENT:
Saipem Contracting Nigeria Limited
SUBCONTRACTOR:
Enikkom Construction Limited
PROJECT STATUS:
Completed, April 2016.