Project Highlight

Replacement of the vandalized section of the Mosimi to Atlas Cove (Arepo to Imagbon) 3km pipeline using Horizontal Directional Drilling.

Scope of Project

  • Procurement, feasibility study, design, welding, pre-testing, drilling of the 3km long x 16″ crossing using 2 nos. Maxi rigs (300Tons and 500Tons)
  • HDD intersect method was also used here whereby the 2 rigs drilled from both ends, intersecting at the middle of the pilot hole.
  • Tile-in/Commissioning
  • Cathodic Protection (CP) Installation.
PROECT NAME:

Emergency Reconstruction of Atlas Cove – Mosimi 16″ X 3000 pipeline section at Arepo swamp using Horizontal Directional Drilling (HDD).

CLIENT:

NNPC/PPMC

CONTRACTOR:

Enikkom Construction Limited

PROJECT STATUS:

Completed, April 2017.