Project Highlight

Ango to Auntie Julie Pipeline works for the provision of hydrocarbon evacuation pipeline from the Ango reservoir in OML-59 to Auntie Julie production facility.

Scope of Project

  • Dredging of creeks, canals and access channels to provide access for drilling rigs and associated marine equipment.
  • Dredging of well slots in accordance with the Field Development Program.
  • Engineering and procurement of all wellhead platforms, wellhead pipping, gathering equipment/systems, flowlines and gathering manifolds including associated wellheads controls, ESD systems, electrical and instrumentation systems and multi-phase metering system.
  • Fabrication of wellhead platforms and wellhead pipping.
  • Fabrication of 12″ ligament inlet manifold
  • Fabrication of 12″ diameter pipeline launcher skid
  • Fabrication of 12″ diameter pipeline receiver skid
  • Installation of wellhead platforms
  • Installation of wellhead piping, control systems and ESD systems
  • Installation of entire gathering system comprising twelve (12) flowlines traversing wellhead slots, rivers, creeks, (major & minor) and swamp terrain.
  • Pre-commissioning & Commissioning of gathering systems
  • Installation of 12″ bulk pipeline system 4km through swamp terrain via HDD installation
  • Installation of 12″ bulk pipeline shore approach – 2.5km in length
  • Pre-commissioning & Commissioning of 12″ pipeline system 35km in length.
PROECT NAME:

Ango to Auntie Julie Pipeline works for the provision of hydrocarbon evacuation pipeline from the Ango reservoir in OML-59 to Auntie Julie production facility.

CLIENT:

Belbop Nigeria Limited/ MSI Africa Development Limited

SUBCONTRACTOR:

Enikkom Construction Limited

PROJECT STATUS:

Completed, November 2016.